The Steps Of Kitchen Cabinet Installation

- Aug 02, 2018 -

The Steps of Kitchen Cabinet Installation

▲Step 1 Preparation: kitchen cabinet installation can be done after the kitchen wall and floor tiles are laid and the kitchen ceiling is completed. The whole kitchen cabinet generally needs 15~30 days custom cycle, and it takes 1 day to install the door. It is usually installed on the same day as the hood.

 

▲Step 2 Clean up and materials entering the site: Make protective measures for the kitchen, hang the cloth, kitchen wall, etc. for simple cleaning, in order to accurately measure the ground level, and at the same time enter the field.

 

▲Step 3 Install and adjust the kitchen cabinet: Unify the kitchen cabinets, move them into the kitchen, and place them in the order of the drawings. According to the construction specifications, in many cases, they should be placed upside down, and then the feet should be installed uniformly. The floor is covered with a protective material, and the cutting mouth is operated from the reverse side according to the size of the object, so as to ensure that the front side of the kitchen cabinet does not collapse.

 

▲Step 4 Level adjustment: Adjust the level of the kitchen cabinet through the adjustment legs of the kitchen cabinet, and the error is plus or minus 1mm. If there is a corner kitchen cabinet, the corner kitchen kitchen cabinet should be installed first. No corner kitchen cabinet should be installed from the kitchen cabinet against the wall.

 

▲Step 5: Install the wall kitchen cabinet: Determine the distribution position of the wires and pipes in the wall, and adjust the height of the wall kitchen cabinet according to the height of the user. Draw a horizontal line. The distance between the horizontal line and the table surface is 650mm. You can use the height according to your height. The foreman proposed the adjustment of the distance between the kitchen cabinet and the kitchen cabinet to facilitate future use.

 

▲ Step 6 Fixed wall kitchen cabinet: The wall kitchen cabinet and wall surface are firmly installed. There is no less than 2 fixed hanging code per 900mm to meet the load bearing requirements. At the same time, the installation of the hanging code, for example, the positioning of the line, in turn, the eye hooks are fixed on the wall surface, and then the hanging kitchen cabinets are sequentially hung in order.

 

▲Step 7 Cutting the table top plate: After the kitchen cabinet is leveled, install 25 thick table top plates on the top of the kitchen cabinet. The sides of the sink and the stove must be padded with a small amount of glass glue for fixing. At this stage, it is important to note that all the bolsters must be cut with a saw when cutting.

 

▲The 8th step after cutting: the cutting and punching table, the aspect ratio is 3mm larger than the actual object, the corner is generally 25MM arc shape, the sticky sink is placed on the pad, and the gap between the table and the wall is kept at 3 ~5mm.

 

▲Step 9 Bonding the sink and countertop: A seemingly simple step, especially paying attention! The joint is glued with marble glue and a layer of wax is applied.

 

▲Step 10 Ensure that the glass is glued tightly to the wall: It takes 1~2 hours for the glue to fully cure. Do not remove or move it at will. After the glue is cured, the excess part of the glue is smoothed with a sander.

Accessory installation phase

 

▲Step 11 Install the kitchen cabinet hardware hinge: the height of all the door panels keeps the lower edge of the door panel level with the lower edge of the kitchen cabinet. After the door panel is leveled, all the hinges are covered with a hinge cover, and the operation is carried out with a boring cutter. Between 1.5mm.

 

▲Step 12 Install the kitchen cabinet door hardware hinge: installation of the basin, faucet and basket, the opening of the installation site, the hole diameter should be at least 3-4mm larger than the pipe, and the exposed cross section should be sealed with the seal after punching. Sealed, edge water seepage deformation. The hose and sewer should also be sealed with glass glue.

 

▲Step 13 Install the electrical circuit and the sewer pipe: The installation of the embedded electrical appliance in the kitchen cabinet only needs to open the power supply hole on the spot, but the power supply hole cannot be opened too small to avoid disassembly in the future. If the water meter and the air meter are wrapped up, there will be troubles in the future maintenance, and the state has relevant standards that do not allow this.

 

▲Step 14 Thoroughly clean the site: Check that all the wires are installed in place, whether the door panel is leveled, and whether there are any remnants in the kitchen cabinet. Doors and frames, doors and doors, drawers and kitchen cabinets, drawers and doors, drawers and drawers adjacent to the surface gap ≤ 2Mmm, and feel the height of the kitchen cabinet and kitchen cabinet in use is comfortable.

 

▲Step 15 Install the kitchen cabinet skirting board: Finally, cut the skirting board according to the length of the kitchen cabinet and fix it. If there is a corner, it must be fixed with a corner fitting. After all the installation is completed, open the door for ventilation and odor. At this point, a set of standard kitchen cabinet installations is now complete.


Tel: +86-571-56976336

Phone: +86-13655718033

Email: info@kitchen-cn.com

Contact person: Sum Landy

ADD: Room 538,Unit C,Jewel Center No 16 Kangyuan Road,Hangzhou ,China.310015

 


Related News

Related Products

  • American Style Solid Wood Narrow Bathroom Cabinets Vanities With Slim Storage And Mirror
  • Prefab Black Engineered Solid Stone Kitchen Countertops
  • Ready Built Popular Asj Staining Veneer Darker Resurfacing Kitchen Cabinets
  • Shaker Staining Liquidators American Woodmark Kitchen Maid Cabinets
  • Affordable Modern Rustic Hand Painted Solid Wood Oak Overhead Kitchen Cupboards Cabinets
  • Country Style PVC Modular Curved Classics Kitchen Cabinets Brisbane