Kitchen Cabinet Installation Process(2)

- Jan 18, 2019 -

Kitchen Cabinet Installation Process

3. Countertop installation stage

▲Step 7 Cutting the table top plate: After the kitchen cabinet is leveled, install 25 thick table top plates on the top of the kitchen cabinet. The sides of the sink and the stove must be padded with a small amount of glass glue for fixing. At this stage, it is important to note that all the bolsters must be cut with a saw when cutting.

▲The 8th step after cutting: the cutting and punching table, the length and width are 3mm larger than the actual object, the corner is generally 25MM arc shape, the sticky sink is placed on the pad, and the gap between the table and the wall is kept at 3 ~5mm.

▲Step 9 Bonding the sink and countertop: A seemingly simple step, especially paying attention! The joint is glued with marble glue and a layer of wax is applied.

▲Step 10 Ensure that the glass is glued tightly to the wall: It takes 1~2 hours for the glue to fully cure. Do not remove or move it at will. After the glue is cured, the excess part of the glue is smoothed with a sander.

4. Accessories installation stage

▲Step 11 Install the kitchen cabinet hardware hinge: the height of all the door panels keeps the lower edge of the door panel level with the lower edge of the kitchen cabinet. After the door panel is leveled, all the hinges are covered with a hinge cover, and the operation is carried out with a boring cutter. Between 1.5mm.

▲Step 12 Install the kitchen cabinet door hardware hinge: installation of the basin, faucet and basket, the opening of the installation site, the hole diameter should be at least 3-4mm larger than the pipe, and the exposed cross section should be sealed with the seal after punching. Sealed, edge water seepage deformation. The hose and sewer should also be sealed with glass glue.

5. Pipeline dredging stage

▲Step 13 Install the electrical circuit and the sewer pipe: The installation of the embedded electrical appliance in the kitchen cabinet only needs to open the power supply hole on the spot, but the power supply hole cannot be opened too small to avoid disassembly in the future maintenance. If the water meter and the air meter are wrapped up, there will be troubles in the future maintenance, and the state has relevant standards that do not allow this.

6, cleaning cleaning stage

▲Step 14 Thoroughly clean the site: Check that all the wires are installed in place, whether the door panel is leveled, and whether there are any remnants in the kitchen cabinet. Doors and frames, doors and doors, drawers and kitchen cabinets, drawers and doors, drawers and drawers adjacent to the surface gap ≤ 2Mmm, and feel the height of the kitchen cabinet and kitchen cabinet in use is comfortable.

▲Step 15 Install the kitchen cabinet skirting board: Finally, cut the skirting board according to the length of the kitchen cabinet and fix it. If there is a corner, it must be fixed with a corner fitting. After all the installation is completed, open the door for ventilation and odor. At this point, a set of standard kitchen cabinet installations is now complete.

Tel: +86-571-56976336

Phone: +86-13655718033

Email: info@kitchen-cn.com

Contact person: Sum Landy

ADD: Room 538,Unit C,Jewel Center No 16 Kangyuan Road,Hangzhou ,China.310015

 


Related News

Related Products

  • White Two Pack Kitchen Cabinets
  • Walnut Solid Wood Kitchen Cabinet
  • Corian Solid Surfaces Counter Kitchen Countertops Design
  • White Cultured Marble Types Of Kitchen Countertops For Replacement
  • Ready Made Maple Hardwood Country Kitchen Cabinets Units
  • High Gloss PVC Modular White Colors with Open Pantry Kitchen Cabinets